Bighorn Basin
Coring Project

Quick Facts
•  Location:
    Bighorn Basin, Wyoming
    44.42° N
    108.1° W
•  Drilling Sites
    - Basin Substation
    - Polecat Bench
    - Gilmore Hill
•  Drilling completed in
    August, 2011
•  Scientific Study of Cores
    2012 and 2013

Related Links
   - BBCP on Facebook
   - BBCP on Intercontinental
     Drilling Program Site
   - BBCP Outreach


nasa logo

Gilmore Hill(44.516327N, 108.645622W)

Gilmore Hill has well-exposed but steep outcrops that have excellent magnetostratigraphic and mammalian biostratigraphic control.

It is one of the most complete sections that spans the Wa-4/Wa-5 biozone boundary (= “Biohorizon B”) which is the largest mammalian turnover in the early Eocene after the PETM.

Recent isotopic sampling of the surface section in the area has established the existence of an isotopic shift that correlates with the H2 hyperthermal event. Retrieving a core record here will allow us to apply the various methods outlined above to pristine sedimentary material to better document the continental effects of non-PETM hyperthermals, further constrain their cause, and compare them to records of the PETM.

 

Drilling Results

From Aug 1-5, 2011 two overlapping cores were successfully drilled at Gilmore Hill. One core (BBCP-GMH11-3A) is 202.4 meters and the second core (BBCP-GMH11-3B) is 66.7 meters long. Both cores were drilled using only muncipal water thus minimizing the risk of downhole organic contamination. Downhole geophysical logs (magnetic susceptibility, resistivity, density etc) were recovered for 89 meters in the first hole and the entire 66 meters of the second hole.


polecat bench

BBCP science team looking over Gilmore Hill outcrops during planning meeting.